Traducido automáticamente
🏛 AIDES_TERRITOIRES · 📍 Nouvelle-Aquitaine
Not specified
Jan 18, 2022
Not specified
Energy / Waste / Energy transition, Energy / Waste / Energy saving and energy renovation, Solidarity / social link / Access to services, Nature / environment / Air quality, Support functions / Animation and networking, Mobility / transport / Shared mobility, Mobility / transport / Urban logistics, Mobility / transport / Mobility for all, Mobility / transport / Knowledge of mobility, Energy / Waste / Reduction of carbon footprint
Support for Gironde communities in the transfer of IRVE competence.
Deployment of charging stations: The support differs depending on the charging station concerned and what is planned in the SDIRVE (Master Plan for Electric Vehicle Charging Infrastructures).
Case n° 1: Supply and installation of an electric vehicle charging station, including connection, excluding extension, priority within the framework of the SDIRVE.
The subsidy rate varies from 30% to 100% (depending on the community) for the following charging stations:
The subsidy rate varies from 0% to 100% for 120kW DC superchargers near expressways/motorways. Average charge: 20min/240km. Civil engineering and network reinforcement works are not included.
Case n°2: Supply and installation of an electric vehicle charging station, including connection, excluding extension, non-priority in the SDIRVE.
The subsidy rate varies from 0% to 60% for the following charging stations:
Operation: Deu…