Urban planning / housing / development / Roads and networks, Energy / Waste / Energy transition
Erasing consists of concealing overhead power grids, making them more discreet. To achieve this, low-voltage grids will be buried underground or installed on facades, and old "tower-type" transformer stations will be demolished. These works aim to improve the aesthetics of the commune's neighborhoods, optimize the integration of networks into the environment, and further secure networks in case of bad weather conditions (storms, etc.). At the request of the commune, SIEDS coordinates the Technical Network Erasing Committee (C.T.E.R.). The objective of this meeting is to present the program criteria, the development project in order to specify the study perimeter and to estimate the estimated cost of the works. At the end of this visit, a report is provided and allows a decision to be made on the feasibility of the project that the community wishes to undertake.